asxpio/views/admin/bingo
Sergei Poljanski e5bd1c1ac7
All checks were successful
Build and Deploy to Production / test (push) Successful in 23s
Build and Deploy to Production / build (push) Successful in 1m0s
Build and Deploy to Production / deploy (push) Successful in 39s
bingo: planned status and capacity type
"MW" on the card mixed IT load, connected power, total site power,
design capacity and even MVA (Oxygen, Sber Yuzhny Port). Record which
one a figure is in a new mw_type column; the dialog tags the number
("64 MW · design") and MVA replaces the unit, while cells keep the bare
figure to stay readable. Add a "planned" status for projects not yet
under construction; like "building", it is left out of the operational
view.

Assisted-by: Claude:opus-5
2026-10-10 06:59:04 +04:00
..
edit.erb bingo: planned status and capacity type 2026-10-10 06:59:04 +04:00
index.erb bingo: planned status and capacity type 2026-10-10 06:59:04 +04:00