"MW" on the card mixed IT load, connected power, total site power,
design capacity and even MVA (Oxygen, Sber Yuzhny Port). Record which
one a figure is in a new mw_type column; the dialog tags the number
("64 MW · design") and MVA replaces the unit, while cells keep the bare
figure to stay readable. Add a "planned" status for projects not yet
under construction; like "building", it is left out of the operational
view.
Assisted-by: Claude:opus-5