"MW" on the card mixed IT load, connected power, total site power,
design capacity and even MVA (Oxygen, Sber Yuzhny Port). Record which
one a figure is in a new mw_type column; the dialog tags the number
("64 MW · design") and MVA replaces the unit, while cells keep the bare
figure to stay readable. Add a "planned" status for projects not yet
under construction; like "building", it is left out of the operational
view.
Assisted-by: Claude:opus-5
|
||
|---|---|---|
| .. | ||
| 001_invoices.rb | ||
| 002_invoice_ltc.rb | ||
| 003_invoice_crypto.rb | ||
| 004_bingo.rb | ||
| 005_bingo_photo_variants.rb | ||
| 006_bingo_mw_type.rb | ||